Low-voltage deck lighting needs a power plan
Low voltage does not mean we can skip the power question. The transformer needs a suitable source, the cables need a protected route, and the switch, timer or automation needs to work with the chosen fixtures. On a new deck, we can consider those paths before boards and rail caps go on. On an existing deck, we first see what we can reach underneath and inside the posts.
The City of Spokane has an electrical permit process that includes low-voltage circuits. State guidance says most electrical work needs a permit, with exceptions, and the person or contractor doing the work obtains it from the proper authority. We define any electrical trade work and who is responsible for it for your address; we do not assume every low-voltage installation is exempt or that our deck team is the electrical contractor.